In short
- Report the first photo of a blister or lifted edge to the policy in force that day. Once someone in charge knows before renewal, the next policy can treat the damage as already known.
- Read your policy for a total pollution exclusion. The standard form gives back some indoor fume claims from materials you bring in, and that replacement wording can take it away.
- Ask in writing how your insurer treats the slab you prepared, the tear-out of sound coating, and a floor laid by a subcontract crew.
- Keep silica exposure results, get the asbestos survey before grinding old mastic, and look for exclusions that name either one.
- Save a signed texture sample and hand over written care instructions, because a fall after you leave can turn on what you promised and what you warned about.
- Check what your auto policy says about resin and solvent spilled in a wreck, and ask for transport coverage on a pollution policy.
A resin floor fails at a line nobody can see, where primer meets concrete. Above it is your work. Below it is the customer’s slab. When the floor lifts, the insurance argument turns on which side got hurt.
This page is for companies that install epoxy, urethane cement, MMA, polyaspartic and broadcast floors, polish concrete, coat garages, and grind or shot blast slabs for other trades. Carpet and plank are covered under flooring contractor insurance.
Blisters, peeling and the two halves of the claim
Quotations are from ISO’s commercial general liability form CG 00 01, in the copy Sonoma County posts. Yours may be another edition or endorsed.
Before the owner takes the floor back
Exclusion j(5) removes damage to “that particular part of real property” on which you are performing operations, if the damage arises out of those operations. Gouge the slab with a scarifier, or leave swirl marks in a polished floor, and those words describe the surface under your machine. Exclusion j(6) removes “that particular part of any property that must be restored, repaired or replaced because ‘your work’ was incorrectly performed on it,” but j(6) does not apply to completed operations. The walk-in cooler panel your grinder hits is not the floor you were hired to work on, and neither phrase is written for it.
After it cures
Exclusion l removes damage to “your work” that arises out of your work and falls in the “products-completed operations hazard.” When moisture vapor lifts a finished coating, the coating is what that exclusion is aimed at. It “does not apply if the damaged work or the work out of which the damage arises was performed on your behalf by a subcontractor.” If a subcontract crew lays your resin, check whether an endorsement takes that sentence away. Even with it, the claim still has to be property damage caused by an occurrence.
The slab is a separate question. Ask in writing whether the insurer treats the concrete you prepared as your work, and how it treats the cost of tearing out sound coating to reach a bad area.
On a phased job, part of the work counts as completed once it “has been put to its intended use” by anyone other than another contractor on the project.
The bubble somebody mentioned in March
The form applies only if, before the policy period, no one it lists as an insured (owners, partners, members, managers, officers and directors among them, and some spouses), and no employee authorized to give or receive notice, knew the damage “had occurred, in whole or in part.” If one did, any “continuation, change or resumption” counts as known. A “verbal demand or claim” is enough. Picture a customer who texts you a photo of blisters in March. You renew in April and the floor lifts in July. The new policy’s insurer has an argument. Report the photo in March.
The kitchen that cannot open
The Agriculture Department’s inspection rules require floors in meat and poultry plants to be durable materials impervious to moisture. A flaking coat can idle a line with nothing else broken. Exclusion m removes damage to “impaired property” or property that “has not been physically injured” when it arises from a defect in your work or a failure to perform the contract on its terms. The exception is for loss of use of other property after “sudden and accidental physical injury” to your work once it is in use. Slow delamination is a hard fit for “sudden.” If one bad batch of hardener has a chain pulling floors in every store, exclusion n is aimed at the cost of work withdrawn from use over a “known or suspected defect.”
Fumes: two floor jobs that reached court
The chicken. In 1989 a crew resurfaced floors in a Virginia poultry plant with a system containing styrene. Chicken sat in the cooler next door. Customers complained of its smell and taste, tests found styrene, and about $500,000 of it was thrown out. The insurer pointed to the pollution exclusion. In the Tufco decision of 1991, the North Carolina Court of Appeals affirmed judgment for the floor company on four separate grounds. Two of them: the resin, as brought to the site, was not a pollutant, and the exclusion applied only to discharges into the environment. Another ground rested on a rule that damage occurs when it is discovered, and in 2000 the state’s Supreme Court overruled Tufco to the extent it set that bright-line rule.
The classroom. In the Kopliku decision of 1999, a Detroit teacher alleged respiratory injuries from chemicals a painting contractor used to seal the floor above her classroom. The policy had a total pollution exclusion. The federal Sixth Circuit, predicting how Michigan courts would rule because none appeared to have decided the point, held that it did not shield the insurer from liability for injuries caused by “toxic substances that are still confined within the general area of their intended use.” It left open fumes that travel through ventilation, and it listed other courts that had ruled for insurers on indoor contaminants.
The standard form now has wording Tufco’s policy lacked. The job-site part of exclusion f does not apply to injury or damage “sustained within a building and caused by the release of gases, fumes or vapors from materials brought into that building in connection with operations being performed by you or on your behalf by a contractor or subcontractor.” (Its other exceptions are for fluids escaping from mobile equipment and for smoke, heat or fumes from a hostile fire.) Protect that sentence, and learn its edges:
- It says gases, fumes or vapors. Spilled hardener in a floor drain is a liquid, and grinding dust is a solid.
- It says within a building. A loading dock, pool deck or open parking level may not be one.
- It sits in the job-site paragraph, so it does not reach your own shop or waste hauled for you.
- A total pollution exclusion can replace it.
Price contractors pollution liability against that list. Ask whether it names resin application, dust, transport and sites you do not own.
Grinders, shot blasters, old mastic and the crew’s lungs
OSHA’s construction silica rule has a Table 1 row for walk-behind milling machines and floor grinders. To use it, a machine not run wet needs the manufacturer’s recommended dust collector with a filter of 99% or greater efficiency, and indoors a HEPA vacuum picks up loose dust between passes. The hand grinder along the wall has its own row: with a shroud and collector, indoors, it adds a respirator with a protection factor of 10 once the worker’s Table 1 tasks together pass four hours in the shift.
Shot blasting is handled elsewhere. OSHA’s ventilation rule defines abrasive blasting to include an abrasive driven by “centrifugal force,” and the silica rule takes up blasting on silica-bearing surfaces under its alternative methods, where the employer assesses any exposure that may reasonably reach 25 micrograms per cubic meter as an eight-hour average and keeps it at or below 50. Keep the results, and look for a silica exclusion in your liability policy, because other trades breathe that air.
Tile removal before a coating brings asbestos into the bid. In buildings constructed no later than 1980, OSHA’s rule has resilient flooring “including associated mastic and backing” assumed to contain asbestos unless an industrial hygienist finds otherwise. Under that rule, residual adhesive is scraped wet. Get the survey, and look for an asbestos exclusion, before you set the diamonds on black mastic.
If you strip with methylene chloride, EPA’s 2024 rule is no longer in effect. The Fifth Circuit vacated it in September 2026 but left alone OSHA’s exposure limits and EPA’s 2019 ban on making, processing or distributing it for consumer paint and coating removal.
A 1989 California health department fact sheet says some people develop asthma from epoxy curing agents, and that once allergic, even dust from grinding the hardened plastic can cause an attack. Polyaspartic and urethane topcoats can add isocyanates, and a 2014 sheet warns that people working near others who use them can be exposed. That can be a workers’ compensation claim. 29 CFR 1910.1200 requires a written hazard communication program, safety data sheets and training.
A floor can be perfect and too smooth
The federal access standards require accessible floors to be slip resistant and do not set a minimum coefficient of friction. The Defense Department’s guide specification for epoxy floors warns that glossy final finishes may cause a slip hazard when exposed to water or oily lubricants, and tells the designer to state the finish and the grit.
A diner’s fall on a floor you finished belongs to completed operations, and the exclusions for your own work address property, not injury. The form’s definition of your work also takes in “warranties or representations” about fitness or performance and “the providing of or failure to provide warnings or instructions.” An anti-slip promise and missing cleaning instructions are both in there. Get the texture sample signed. The Access Board notes that slip-resistant finishes may require continued maintenance or re-application; say so at closeout, and check the policy for a slip or traction exclusion.
Solvent, sparks and the van
A solvent-borne primer is a different fire risk from a high-solids epoxy. OSHA allows Category 1, 2 and 3 flammable liquids to be used only where there are no open flames or other sources of ignition within 50 feet, unless conditions warrant greater clearance. In a garage, start with the water heater. A Washington State narrative describes a day laborer installing vinyl flooring, employed informally and as needed, who died after his propane torch ignited the adhesive and the vapor exploded. List helpers like that on the workers’ compensation application.
Moving the kits has its own rule. The federal exception for materials of trade lets you carry Class 3 and Class 8 materials in Packing Groups II and III in packages up to 66 pounds or 8 gallons, with a limit of 440 pounds in all on the vehicle, if the packages are leak tight, secured and marked and the driver is told what is aboard. A full-size drum of solvent is outside it.
Commercial auto can cover the crash and leave the spill to you. The standard business auto form, CA 00 01, excludes injury or damage from pollutants “being transported or towed by” the covered auto. One exception is for the vehicle’s own fuels and fluids. Another is for pollutants not in or on your vehicle that it upsets away from your premises. Neither describes your own kits in the ditch. Ask for transport coverage on the pollution policy.
What a resin specification makes you promise
That Defense specification, UFGS 09 67 23.13, has the installer report unsatisfactory substrates, confirm moisture is within the manufacturer’s limits (ASTM F1869 and F2170 are among the tests offered), list similar installations and give a written warranty, two years in the bracketed default. Unacceptable work is replaced at no additional cost.
If the owner asks which mitigation primer you would use on a wet slab, answering may be design. Ask whether your general liability has a professional services exclusion and whether contractors’ professional liability would answer for that advice. Write down who accepted the slab, and treat the warranty as your own money.
Then come the names. On your general liability, CG 20 10 makes a general contractor or owner an additional insured for your ongoing operations, and stops once all the project work there is completed or that portion of yours has been put to its intended use, which on a phased floor may be the day the owner’s forklifts return. CG 20 37 reaches completed operations, the form a grocery chain needs when a shopper falls next year. CG 20 01 makes your policy primary to an additional insured’s own policy when you agreed to that in a written contract. CG 24 04 waives your insurer’s recovery rights against the person or organization named in its schedule.
A commercial umbrella raises the limits, and a bond backs your performance. Grinders, blasters and vacuums go on inland marine; ask how resin ruined in a frozen trailer is treated. Commercial property is for the shop.
State rules that reach resin, coating and flooring work
Boards differ, so ask before you apply.
- California. The Contractors State License Board’s D-12 synthetic products class names “resin and epoxy application.” D-6 covers floor hardening treatment, and C-15 covers preparing surfaces for flooring. The contractor’s bond is $25,000.
- Arizona. The Registrar of Contractors lists “concrete coatings” under floor covering, C-8 commercial and R-8 residential, and “liquid floor and wall coatings” under painting, C-34 and R-34.
- Nevada. The State Contractors’ Board’s C-16a takes in polyurethane and other materials used as “coatings or coverings used to finish floors,” with the preparation.
- Connecticut. The home improvement law names garages and flooring on residential jobs over $200, but leaves out the construction of a new home. Applicants for registration show the Commissioner of Consumer Protection at least $20,000 of general liability.
- Vermont. Residential contractors register with the Office of Professional Regulation before contracting with a homeowner for more than $10,000, and keep liability limits of $1,000,000 per occurrence and $2,000,000 aggregate.
South Coast Air Quality Management District Rule 1113, as amended February 5, 2016, reaches anyone who applies a coating, stores it at a worksite or solicits its application in the district. Its table sets 50 grams of VOC per liter for floor coatings and 100 for industrial maintenance coatings, with exemptions, and the rule bars industrial maintenance coatings, apart from one anti-graffiti type, from residential use.
Workers’ compensation classes need the same care. In Washington, 0502 covers floor coverings from carpet to terrazzo and 0504 covers waterproofing floors by brush, roller or spray. Neither names a resin floor system, so ask Labor and Industries.
What an underwriter counts on a floor job
The price follows what you put down, what you take off, and who is in the building meanwhile. Split receipts among garages, commercial floors, food plants and polishing. Solvent-borne systems, old-tile removals, subcontract crews, payroll, drivers, claims and limits all enter in.
Flooring owners’ questions
Does general liability pay when an epoxy floor peels?
Under the standard form, the finished coating itself runs into exclusion l unless the exception for a subcontractor’s work applies. Damage to other property is a separate question, so report both.
What insurance does a commercial flooring business need?
General liability with completed operations, workers’ compensation as the state requires, commercial auto, equipment coverage and pollution. Contracts add the umbrella, additional insured forms and bonds.
Is residential flooring insurance any different?
It can be. Declare garages and houses on their own line, and look for an exclusion that takes out condominiums, townhouses or new tracts.
Do Vermont and Connecticut require flooring contractors to have insurance?
Yes, for residential work within their registration laws, at the amounts above. Vermont’s law leaves out work on a structure not attached to a residential building, so a detached garage can be outside it.
How much does epoxy floor insurance cost?
It depends on the items in the section above. Send them and you can get a figure.
Get an epoxy flooring quote
Send your systems and safety data sheets, receipts by job type, payroll, subcontract cost, equipment and vehicle lists, your warranty, a contract’s insurance pages and loss history. Wexford Insurance is an independent agency in Greenwood, Indiana, licensed in 48 states, with a focus on the construction industry. We compare coverage and price across the insurance companies we represent.
Start the quote here or call 317-942-0549. If you also pour, paint or build, read about contractor insurance.
Sources
- ISO form CG 00 01 04 13, sample published by Sonoma County (PDF): insuring agreement; exclusions f, j, l, m and n; definitions. ISO form CA 00 01 10 13, sample published by Sonoma County (PDF): pollution exclusion.
- Court decisions: North Carolina Court of Appeals, 104 N.C. App. 312 (1991) and North Carolina Supreme Court, 351 N.C. 293 (2000), official reports as reproduced by the Caselaw Access Project; U.S. Court of Appeals for the Sixth Circuit, No. 98-1801 (1999, PDF).
- California Intergovernmental Risk Authority, Certificate of Insurance and Endorsements Guide (PDF).
- Unified Facilities Guide Specification 09 67 23.13, Standard Resinous Flooring (PDF).
- OSHA: 29 CFR 1926.1153, 29 CFR 1926.57, 29 CFR 1926.1101, 29 CFR 1926.152, 29 CFR 1910.1200.
- Food plants: 9 CFR 416.2. Transport: 49 CFR 173.6.
- EPA: Risk Management for Methylene Chloride.
- California Department of Public Health: Epoxy Resin Systems fact sheet, 1989 (PDF), Isocyanates: Working Safely, 2014 (PDF).
- Washington State FACE program, adhesive explosion narrative, 2025; U.S. Access Board, guide to floor and ground surfaces.
- California: CSLB D-12, D-6, C-15, bond requirements; South Coast AQMD Rule 1113 (PDF). Arizona: R4-9-102, R4-9-103. Nevada: Administrative Code chapter 624.
- Connecticut: General Statutes chapter 400. Vermont: 26 V.S.A. chapter 106. Washington: WAC 296-17A-0502, WAC 296-17A-0504.
Epoxy Flooring Contractors: related pages
- SpecialtyContractors Insurance
- CoverageCommercial Umbrella Insurance
- CoverageInland Marine and Contractors Equipment Insurance
- BlogContractors articles
Epoxy Flooring Contractor Insurance by state
- Alabama
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- Florida
- Georgia
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Business auto for Epoxy Flooring Contractors by state
All states
- Alabama
- Arizona
- Arkansas
- Colorado
- Connecticut
- Delaware
- Florida
- Georgia
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- West Virginia
- Wisconsin