What Should a Plumbing Service Agreement Include?

Before a crew touches a pipe, a plumbing service agreement should record who does the work, what the price covers, how it can change, when money is due and what you stand behind.

State rules below, mostly from California and Indiana, are examples, not a national standard.

Who is contracting, and when the work happens

Put your legal business name, address, phone, email and license number at the top, next to the customer's details and the job address. California's licensing board (CSLB) says a home improvement contract should show the contractor's name, business address and license number.

Add the estimated start and completion dates and call them estimates if parts or inspections can delay the job. Indiana's attorney general lists those dates among the contents of a home improvement contract, which must be in writing above $150.

Describe the scope, and what is outside it

Name the work. "Replace a 50-gallon gas water heater and reconnect to the existing flue and supply lines" tells both sides what the price buys; "water heater install" does not.

List what you will not do, such as drywall repair, painting or tile work. Add a concealed-conditions line: if you find corroded supply lines or an earlier unpermitted repair behind the wall, work on that part stops until the customer approves a written price.

Pricing: flat, hourly and emergency calls

Flat prices suit defined jobs such as a fixture swap; hourly billing suits diagnostics. Say which one applies, and for hourly work state the rate, any minimum trip charge, whether drive time is billed, and how partial hours are rounded.

For emergency and after-hours calls, write the premium rate or multiplier into the agreement and show it to the customer before work begins.

Materials, permits and cleanup

Decide who supplies fixtures and parts and whether you add a markup. Give permits a named owner as well: CSLB asks for written direction on who will obtain permits.

State who hauls away the old water heater, cut pipe and packaging, and whether disposal is included in the price.

Change orders belong in writing

Any change to price or scope gets a signed change order before the extra work starts. California's board requires a written change order, signed by both sides before the change, which then becomes part of the contract.

For example, a quote to replace a water heater assumes the existing shutoff valve works. The technician finds the supply line corroded and fused to the valve.

The change order names the problem, the added parts and labor with their price, any effect on the schedule, and a signature line for each side. Say what happens if the customer cannot sign right away, such as leaving the water off safely until approval. ConsumerShield, an online library of legal forms and plain-language guides, has service agreement templates you can fill in online and adapt with clauses like these.

Deposits and payment terms

Deposit rules differ by state. In California a home improvement down payment cannot exceed $1,000 or 10 percent of the contract price, whichever is less, and the contract needs a detailed written payment schedule. California also limits later payments: they cannot exceed the value of the work performed.

State each due date and the accepted payment methods, and tie each installment to a stage of the job. Add a late fee only if your state permits one.

Warranty: what you offer and what the manufacturer owes

A written labor warranty is something you choose to offer; CSLB asks only that any warranty the contractor offers be in writing. If you offer one, say when it begins, what it covers, how to report a problem, what is excluded (freeze damage, later work by someone else) and your remedy, such as redoing the labor.

That warranty sits on top of your other obligations, not in place of them. Your contract promises the work it describes, and CSLB lists poor workmanship as a ground for a complaint against a licensed contractor whether or not a written warranty was offered.

Treat the manufacturer's warranty as a separate document. Whether a factory defect is covered depends on that warranty's terms, so the agreement should not promise it.

A customer-supplied faucet shows why the split matters. If the faucet itself is defective, the claim may belong under the manufacturer's warranty, depending on its terms. If it leaks because of a bad connection you made, that is your installation, with or without a separate warranty. Write down that you stand behind your installation, not a part you did not supply.

Liability, insurance and access to the home

Put access duties on the customer, such as a clear path to the shutoff valve, and record existing damage on the work order before starting.

Depending on its terms and exclusions, a general liability policy may respond when your work damages other property, such as a failed connection that floods a finished basement, yet not pay to redo the faulty work itself. The Wexford guide to plumbing general liability covers what these policies include and leave out.

Signing and the right to cancel

Finish with signature and date lines for both sides, and say the quote expires on a stated date. Cancellation depends on how the sale was made. The FTC's Cooling-Off Rule applies where the seller personally solicits the sale and the customer agrees to buy away from your place of business, for $25 or more when that is the customer's home. It does not reach every plumbing job.

One exclusion covers a bona fide immediate personal emergency, but only when the customer initiated the contact and gives you a separate dated and signed statement, in the customer's own handwriting, that describes the emergency and expressly acknowledges and waives the three-business-day right to cancel. A signed note about the emergency alone is not enough. Another exclusion covers a visit the customer initiated and specifically requested to repair or maintain the customer's personal property. That exclusion is narrow and does not cover every service call or all work on the house's piping. Anything else sold on the visit, apart from replacement parts needed to finish the repair, is still covered by the rule.

Where the rule does apply, the contract or receipt must state in bold, at least 10-point type, that the customer may cancel before midnight of the third business day. You also hand over two copies of a completed Notice of Cancellation form and explain the right orally. Have a local attorney check the finished agreement against your state's rules.

Recent Posts

Get A Free Quote

Call 317-942-0549 or request a quote online.

Get A Free Quote